Anderson Shelter Restoration: Day 25-26

Over the last couple of days, we have begun to fill-in the sides of the Anderson shelter using the soil dug out of the hole we placed the shelter in. Due to the rocky nature of the soil taken out of the hole, we have been very careful when placing this around the sides and rear of the shelter; we have tried to put as many stones as possible at 'ground' level, leaving the better quality soil to eventually cover the roof. 


The roof of the shelter will eventually be used as an extension of the vegetable garden, and therefore needs to be of a suitable quality to grow things in. Once the shelter is covered over with approximately 9-12" of soil, work can begin on fitting out the inside with bunks etc.