Search This Blog

Monday 23 May 2011

Anderson Shelter Restoration: Day 27

Just a quick update today; we continued to cover thew shelter with soil this evening, continuing the line of the bank to the left, and forming a gradual downwards slope to the right. There is currently only about 2" of soil covering the roof, but eventually this will increase to approximately 9-12".

The left-hand bank was also cut back and shaped to tidy the line from the front of the shelter.


No comments:

Post a Comment